Home

Company

Employees

Providers

Clients

Contact

    

Intercontrol Levante, S.A. on LinkedIn
Confidence
Availability
Quality

I+D+i

Technological developments

 

- Instrumentation consultancy

- Instrumentation projects

- Equipment supply

- Turnkey operation

- Facility operation 


►Instrumentation of segment T2 of Valencia metro (2007)

►Strain gauge instrumentation of south access bridge to Cullera (Valencia 2007)

►Landslide control of Arenós reservoir (Castellón 2006)

►Anchor traction control of Alarcón dam (Cuenca 2004)

►Crack control in Pinedo WWTP reactor (Valencia 2003)

►Traction control in teeth of the new spillway for Arenós dam (Castellón 2002)

►Concrete control of the arch of the new Arenós dam spillway (Castellón 2000)

►Pressure control of loose material body of El Algar dam (Castellón 1999).

►Strain gauge instrumentation of northern bridge access to Alzira (Valencia 1998)


Highslide JS
Instrumentation on Arenós arch dam spillway
Highslide JS
Landslide control ofArenós dam using differential GPS
Highslide JS
Anchor tension control with cantilever support 

News

 Internews

» 2010

» 2009

» 2008               

            

Sheets and Articles

 Sheets

» Consultancy

» Inspections and Control

» Environmental Management

» Technology

Articles

» TOP-CART of Valencia 2008

» Bituminous Materials

Quality Guarantee

Company Catalog

Contact

   correo@intercontrol.es

   curriculum@intercontrol.es

© Intercontrol. Todos los derechos reservados.

Intercontrol Levante S.A. - 902 468 266 / 962 538 023 - www.intercontrol.es